Back to product group

HOLLAND Dolly Master™

The HOLLAND Dolly Master™ is an economical, tractor nose-mounted device specifically designed for spotting of converter dolly yard spotter applications. 

Product inquiry
Product information

The Dolly Master™ is an in-cab operated, tractor nose-mounted pin coupling device, featuring a double-acting air cylinder that moves a sliding pin up and down for easy spotting of converter dollies. Model TF-675 lifts from bumper height, and models TF-675-1/3A lift from ground height. 

The Dolly Master™ features: 

  • Welded steel frame 

  • Vertical pin slide with integral guide ramps 

  • Optional lock-out cylinder model (TF-675-1) 

  • Optional bolt-on model with lock-out sensor (TF-675-3A) 

  • Black Armour Corrosion Protection 

Technical data
Max. Lift @80 psi: 390 lbs. (177 kg)
Max. Drawbar Pull: 15,000 lbs. (6,800 kg)
Coupling Pin: 1.75” diameter
Weight: 136 - 173 lbs. (61.7 - 78.5 kg) depending on model
Literature
View all
Document Thumbnail
Service Repair Kit SRK-80 Bushing Connection
pdf / 143.55 KB
Document Thumbnail
FWAL Owners Manual (XL-FW10049UM-en-US)
pdf / 2.25 MB
Document Thumbnail
Haldex Original Parts: Aftermarket Policy and Procedure Manual
pdf / 3.65 MB
Document Thumbnail
PH-990ST71 Inspection & Rebuild Procedures (replaces PH-T-990) XL-PH249-03_en-US
pdf / 2.69 MB
Document Thumbnail
XL-PH20103SB_en-US, Technical Service Bulletin - Holland PH990 Inspection & Service Procedures
pdf / 561.31 KB
Document Thumbnail
PH-990ST71 Specifications, XL-PH219-01_en-US
pdf / 711.96 KB
Document Thumbnail
JS-2000 Trailer Stabilizing Jack Owner's Manual (XL-LG20086UM-en-US)
pdf / 3.00 MB
Document Thumbnail
XL-SA20024UM-en-US Rev H, Service Manual INTEGRAL® Disc Brake Axles P89 Parallel Spindle with Precision Bearings
pdf / 11.81 MB
Document Thumbnail
XL-SA20018UM-en-US Rev P, Service Manual P89 Disc Brake Axles
pdf / 11.87 MB
Document Thumbnail
SAF-HOLLAND Original Parts: Aftermarket Policy and Procedure Manual
pdf / 1.13 MB
Document Thumbnail
SmartSTO™ Kit Installation, Operation and Maintenance Manual
pdf / 2.36 MB
Document Thumbnail
Gooseneck Jacks Installation, Operation and Maintenance Manual
pdf / 1.64 MB
Document Thumbnail
XL-FW20231UM-en-US Rev-_web.pdf
pdf / 10.25 MB
Document Thumbnail
2025-11-19 Document Distribution Form (XL-AS20015BM-en-US).pdf
pdf / 522.91 KB
Document Thumbnail
2025-11-19 Document Distribution Form (XL-AA20133BM-en-US).pdf
pdf / 522.89 KB
Document Thumbnail
HOLLAND PH-T-60-AOS-L-8 Swivel Mount Pintle Hook Owner’s Manual
pdf / 2.86 MB
Document Thumbnail
XL-AA20133BM-en-US Rev A Installation Instructions SAF Tire Pilot Plus (TPP) Mechanical to Electronic Control Module
pdf / 1.93 MB
Document Thumbnail
Tire Pilot Plus Parts Manual
pdf / 5.51 MB
Document Thumbnail
Tire Pilot Plus NEW Smartphone App Info
pdf / 4.42 MB
Document Thumbnail
SAF Tire Pilot Plus Regulator Assembly Upgrade Bulletin
pdf / 103.61 KB
Document Thumbnail
XL-FW10049UM-en-US Rev E.pdf
pdf / 2.24 MB
Document Thumbnail
XL-FW10054UM-en-US Rev D.pdf
pdf / 2.35 MB
Document Thumbnail
XL-FW535_RevJ.pdf
pdf / 6.45 MB
Document Thumbnail
HOLLAND ATLAS, CLASSIC, CMS2, CMS3 & CMR Landing Gear Constant Mesh Gearbox Troubleshooting Guide
pdf / 533.50 KB
Document Thumbnail
PH-995 Pin and Clevis Coupler Owner’s Manual
pdf / 2.83 MB
Document Thumbnail
HOLLAND MARK V™ & MARK V™ HD Installation, Operation and Maintenance Manual
pdf / 4.38 MB
Document Thumbnail
Replaceable Kingpin Specifications and Installation Instructions
pdf / 776.06 KB
Document Thumbnail
HOLLAND PH-T-60-AOL-8 Rigid Mount Pintle Hook Owner’s Manual
pdf / 1.58 MB
Document Thumbnail
SAF Air Disc Brake Service Parts Manual
pdf / 6.14 MB
Document Thumbnail
HOLLAND ATLAS Series Installation, Operation and Maintenance Manual
pdf / 2.59 MB
Document Thumbnail
XL-LG20082RM-en-US_web.pdf
pdf / 7.01 MB
Document Thumbnail
Landing Gear Repair Procedures Atlas 55, Atlas 65 and Atlas iM
pdf / 3.32 MB
Document Thumbnail
Repair/Rebuild Manual - Repair/Rebuild Manual
pdf / 7.03 MB
Document Thumbnail
HOLLAND FW35 Owner's Manual
pdf / 14.87 MB
Document Thumbnail
XL-FW232-02
pdf / 3.41 MB
Document Thumbnail
XL-PS10452MM-en-US
pdf / 65.35 MB
Document Thumbnail
Holland XA-2081 Series Rebuild Procedures
pdf / 4.82 MB
Document Thumbnail
Holland ILS Bracket Replacement Manual
pdf / 1.64 MB
Document Thumbnail
Holland ILS Bracket Pins & Cushions Replacement
pdf / 2.64 MB
Document Thumbnail
Holland Fifth Wheels - Pocket Insert Replacement Instructions
pdf / 1.41 MB
Document Thumbnail
Holland FW0100/FW0165 Rebuild Procedures
pdf / 5.36 MB
Document Thumbnail
Holland FW17 Series Rebuild Manual
pdf / 8.69 MB
Document Thumbnail
Holland Pintle Hooks - RK10545 Latch Replacement Procedures
pdf / 3.45 MB
Document Thumbnail
Holland Fifth Wheels - Lube Plate Replacement Instructions
pdf / 1.02 MB
Document Thumbnail
Holland FW35 Series Rebuild Manual
pdf / 14.92 MB
Document Thumbnail
Holland Fifth Wheel Slider Air Line Kit Instructions
pdf / 2.95 MB
Document Thumbnail
Holland XA-2801-03185 Rebuild Procedures
pdf / 2.75 MB
Document Thumbnail
XL-MS20005RM-en-US_RevB_web.pdf
pdf / 678.50 KB
Document Thumbnail
XL-PS20003RM-en-US Rev B.pdf
pdf / 11.55 MB
Document Thumbnail
Landing Gear Grease Specification Sheet
pdf / 1.06 MB
Interested? Get in contact.
Give us a call!